BETA v2.11 In active development
SYLVIA

FAQ / Infrastructure

How does SYLVIA achieve zero computational waste?

SYLVIA's data centre is integrated with Velgrad's secondary geothermal network. Surplus heat generated by computational operations is captured and redistributed to public thermal facilities, including the Velgrad Municipal Spa and three regional heating substations. This closed-loop system ensures that 100% of excess thermal energy is reintegrated into the national energy infrastructure rather than being vented as waste.

← Back to FAQ